Manufacturing in Zhengzhou, China since 2012

BAIFANGROUP

Factory & quality

Where the datasheet numbers come from.

Assembly, electronics testing, photometric measurement and packing across seven production bases in Henan, Hubei, Anhui and Shanxi. Group headquarters and the export desk are in Mengzhuang, Zhengzhou.

Baifan Industrial Park, Zhengzhou
Aerial view of the Baifan production base in Mengzhuang, Zhengzhou
Group headquarters and assembly lines, Mengzhuang, Zhengzhou.

Process

Four gates before anything ships.

Each gate produces a record. If a batch fails a gate it does not proceed, which is the least romantic sentence on this website and the most important one.

01

Incoming

LED bins, drivers, cells and membranes checked against the approved BOM. Cell capacity and internal resistance sampled per lot.

02

Assembly

Torque-checked fasteners, gasket compression verified, IP gasket seated before the housing closes.

03

Test

100 percent power-on and burn-in for luminaires. Photometric spot check on an integrating sphere. RO plants pressure-tested and flushed.

04

Pack

Drop-tested carton sample, packing photo per pallet, container loading record with seal number.

Certification

What is certified, and what is a market file.

These are different things and buyers deserve to know which is which. A test report is not the same document as a SONCAP certificate.

DocumentScopeTypeAvailable
Solar luminaire test reportPhotometric and electrical testingTest reportOn request
Trademark registrationBaifan and Shidian marksRegisteredOn request
Water equipment hygiene permitDrinking water contact materialsPermitOn request
CCC certificationWater purification appliancesProductOn request
Utility model and design patentsWater treatment structuresPatentsOn request
Provincial CDC test reportsHenan and Guangdong drinking waterTest reportOn request
Ultrafiltration membrane test reportZhongke CSH membraneTest reportOn request

Certificate scans with numbers and validity dates are issued after a signed NDA or a confirmed order.

pretreatment RO control
6 m 150 W

Capacity

Two lines, honest lead times.

Standard lead time is 15 to 25 days for repeat orders and 25 to 35 days for a first production run. During peak season we will tell you the real date rather than the date you want to hear.

Assembly
Lighting and water skid lines
Testing
Integrating sphere, burn-in racks, pressure test
Warehouse
Finished goods and component spares
Loading
20 ft and 40 ft, photos per container
Book a factory visit

Ask for the test record.

Any supplier can send a certificate. Ask for the batch record that goes with the unit you are buying.

Request a quote